From requirement study to a running machine and a spare-parts programme — the work we take off your desk, and the commitments we sign up to.
Each service can be bought separately; most clients take the whole chain because the interfaces are where projects fail.
We convert your site data — ore or crop, bench height, haul distance, throughput, power, altitude, climate — into a shortlist of two or three configurations with the numbers behind each choice.
Factory audit, capacity check, reference projects and export record before any deposit. You receive the audit note and the factory quotation breakdown, not just a price.
Contract structure, payment milestones, EAC / GOST-UZB / INMETRO support, origin certificates, IPPC treatment and a single consistent document set for the destination customs.
Rail from China to Central Asia in 7–12 days, or ocean freight to South America in 35–45 days. Booking, heavy-lift lashing, insurance, and clearance support at destination.
Consumable schedules per machine, buffer stock for critical liners and pump parts, and 48-hour dispatch on standard items — so the next shutdown is planned, not a surprise.
Assembly and commissioning guidance, operator training material, fault diagnosis support and a written claim path with named contacts on both sides.
You send the application, site conditions and target budget. We reply within one working day with the questions that matter.
Two or three options with configuration, lead time, landed-cost estimate and the certification route for your country.
Scope, payment milestones, inspection standard, warranty and claim terms agreed in writing before production starts.
Factory build progress, pre-shipment inspection with photo report, and your sign-off before the machine leaves the line.
Certification, packing, booking, documents and clearance — one set of paperwork, one schedule, one contact.
Commissioning guidance, consumable schedule and the spare-parts programme that keeps availability high.
| Inquiry response | Within 24 hours on working days |
| Quotation with configuration | 2–3 working days after technical clarification |
| Pre-shipment inspection report | Issued before balance payment |
| Spare parts dispatch (stock items) | 48 hours after order confirmation |
| Warranty | 12 months from commissioning or 2,000 operating hours |
| Claim response | Written assessment within 5 working days |
| Documentation language | English standard; Russian or Spanish on request |
Tell us the site and the job; we will propose the model, configuration and delivery plan.